A pre-engineered building shed is designed and built with various structural and aesthetic design requirements in mind. PEB buildings are industrial buildings, metro stations, and warehouses of medium to large size. The cost of a PEB structure is typically determined by the structure’s size, materials used, shed height, and so on.
Any medium to small bakery production unit will have these machines in their factory. Baking Oven, Kneader, commercial Mixer, working table, dough sheeters and various other equipment. Other machines are added to a bakery production unit depending on the products produced. Process conveyors are also installed in large-scale units to accommodate increased production.
Any medium to small bakery production unit will have these machines in their factory. Baking Oven, Kneader, commercial Mixer, working table, dough sheeters and various other equipment. Other machines are added to a bakery production unit depending on the products produced. Process conveyors are also installed in large-scale units to accommodate increased production.
Flatted factories is a multi-story building that can house multiple manufacturing units. These factories are intended for small-scale businesses that require minimal space while remaining flexible in terms of material movement, storage, and connectivity to medium and large-scale units.
Mineral water plant setup will have the following
Industrial units – Large scale factories are designed and planned considering the following Various production processes
Indian
Auroville
French
Chettinad
Contemporary
Heritage
Project name: Aditya automation & robotics PVt ltd
Details: PEB shed with 10 tonne EOT crane for assembling auto fixtures
Area: 12,000 square feet
Project name: Aditya automation & robotics PVt ltd
Details: PEB shed with 10 tonne EOT crane for assembling auto fixtures
Area: 12,000 square feet
Project name: Mineral water plant
Details: PEB shed , Landscaping , Water tank
Area:
The timeline is determined by the project’s complexity and the scope of the construction requirements. The timeline is calculated and strictly adhered to using project management software.
All materials used are ISI certified or tested by us and have been used successfully in previous projects.