Industrial Construction

Building relationships one home at a time







    Industrial Construction

    Building relationships one home at a time

    Industry type

    Ped shed

    A Pre Engineered building shed is designed and fabricated considering various structural and aesthetic design requirements. Industrial Buildings, Metro Stations, Warehouses of medium to large size establishments are PEB buildings. The cost of a PEB structure is usually defined by the structure size, materials used, height of the shed etc

    Bakery production

    Any bakery production unit medium to small will have these machines in their factory Baking Oven, Kneader, commercial Mixer, working table, dough sheeters and various other equipment. Depending upon the products which are produced other machines also are added in a bakery production unit. In large scale units process conveyors are also commissioned to cater to more production

    Bakery production

    Any bakery production unit medium to small will have these machines in their factory Baking Oven, Kneader, commercial Mixer, working table, dough sheeters and various other equipment. Depending upon the products which are produced other machines also are added in a bakery production unit. In large scale units process conveyors are also commissioned to cater to more production

    Flatted factory

    Flatted factories is a multi-storied building that has the capacity to lease multiple manufacturing units. These factories are designed for small scale business Entreprises that require minimum space but flexibility with respect to material movement, storage, connectivity to medium and large scale units

    Mineral water plant

    Mineral water plant setup will have the following

    • Raw Water Storage Tank
    • Raw water supply pump
    • Filtration unit
    • Reverse Osmosis System
    • RO Water storage tank
    • Bottling unit
    • Packaging and delivery unit

    Heavy engineering

    Industrial units – Large scale factories are designed and planned considering the following Various production processes

    • Supply chain
    • Readymade product Storage and logistics
    • Administrative and corporate activities
    • HR and employee-related centres like canteen, recreations, etc
    • Raw Material Storage
    • Safety and security system planning
    • Material Handling systems planning
    • Machinery layout of the various individual production centers of the factory
    • Sewage Treatment Plant and industrial waste disposal methodology
    • Scrapyard, disposal, and logistics planning
    • Internal Roads and rainwater harvesting

    House style

    Recent projects

    Project name: Aditya automation & robotics PVt ltd

    Details: PEB shed with 10 tonne EOT crane for assembling auto fixtures

    Area: 12,000 square feet

    Project name: Aditya automation & robotics PVt ltd

    Details: PEB shed with 10 tonne EOT crane for assembling auto fixtures

    Area: 12,000 square feet

    Project name: Mineral water plant

    Details: PEB shed , Landscaping , Water tank

    Area:

    Frequently asked questions

    What will be the project timeline ?

    The time line depends on the project complexity and the scale of the construction needs. The timeline is calculated using project management software and followed strictly.

    What materials are used in the construction?

    All materials used are ISI certified or tested by us and have been used in our previous projects with satisfactory results.

    Let’s connect to discuss your requirements

    Let’s connect to discuss your requirements